TL L5-2451cc 2.5L SOHC G25A4 FI (1995)
2. Assemble the parts below on the mainshaft.
NOTE: Do not install the O-rings during inspection.
3. Torque the mainshaft locknut to 29 Nm (22 ft. lbs.).
NOTE: Mainshaft locknut has left-hand threads.
4. Move the 4th/2nd clutch assembly to check the axial clearances.