acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Shift Lock Solenoid Test|Page 2592 > < Shift Lock Solenoid Test|Page 2590
Page 4
background image

16. Replace the gasket with a new one when installing the solenoid valve cover.

17. Disconnect the connectors from the shift solenoid valve(s) that did not click.

18. Measure the resistance of each shift solenoid valve between the connector terminal and the body ground.

-

If the resistance is out of standard, go to step 21   and replace the shift solenoid valve.

-

If the resistance is within the standard, go to step 19   and check the solenoid valve for a clicking sound.

19. Connect a jumper wire from the negative battery terminal to the body ground, and connect another jumper wire from the positive battery terminal

to each solenoid valve terminal individually. A clicking sound should be heard.

Shift Lock Solenoid Test|Page 2592 > < Shift Lock Solenoid Test|Page 2590