audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

All Other Service Bulletins for Paint:|000203|Page 6122 > < All Other Service Bulletins for Paint:|000203|Page 6120
Page 4
background image

Note:

For deep stone chips, it may be necessary to apply color a second or third time. If so, then apply second and third coats at 5 minute intervals.

Allow repaired surface to dry for minimum 10 minutes and maximum of 30 minutes.

Step 3. - Applying Repair Finish to repairs

-

Fold a clean MULTI WIPE (twice) around the plastic applicator (included in kit).

Note:

MULTI WIPE cloth may be cut in half to minimize waste.

-

At the same time, ready the polishing block by, wrapping the block (once) with a clean MULTI WIPE.

Once applicator and polishing block have been prepared (wrapped with MULTI WIPES):

All Other Service Bulletins for Paint:|000203|Page 6122 > < All Other Service Bulletins for Paint:|000203|Page 6120