Main shaft needle bearing installation
Beginning with transmission date 20 08 0, the main shaft needle bearing in the final drive housing is installed 2.0 mm deeper.
^
dimension a = current:
214 mm
New:
216 mm
The final drive housing is slightly milled-out in the reverse gear area (arrow).
Note
The new reverse gear can only be installed in transmissions that have the revised housing and main shaft.
Tensioning cable mounting
Beginning with transmission date 20 08 0, the tensioning cable mount on the transmission was changed.
^
dimension a = current:
23.5 mm
New:
31.5 mm
Beginning in 9/90 a mounting hole in the housing replaces the previously used mounting stud (arrow). The tensioning cable bracket is then
provided with a mounting stud.
Note
Change the cable bracket when installing a new transmission.