–
| Screw out the bolt -1-. |
–
| Remove the operating unit: Heater → Chapter, manually controlled air conditioner → Chapter, automatically controlled air conditioner → Chapter. |
–
| Release -arrow- the footwell vent -2-, carefully pull off and detach downwards between the brace for the central tube and the heater/air conditioning unit. |
Install in reverse order, paying attention to the following: |
–
| Install the operating unit: Heater → Chapter, manually controlled air conditioner → Chapter, automatically controlled air conditioner → Chapter. |
|
|
|