audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Supercharger > < Adjusting vacuum unit for turbocharger
Removing and installing turbocharger
Removing and installing turbocharger
Special tools and workshop equipment required
   
t  Hose clamps for hoses up to 25 mm -3094-
  W00-0079
t  Hose clip pliers -VAS 6362-
Removing
  Caution
If the turbocharger has suffered mechanical damage (e.g. damaged compressor wheel), it is not sufficient merely to fit a new turbocharger. The following work must be performed in order to avoid further damage:
t  Check air cleaner housing, air filter element and air hoses for dirt and foreign particles.
t  Check the entire charge air system (including the charge air cooler) for foreign matter.
t  If foreign matter is found in the charge air system, clean all relevant ducts and hoses and renew charge air cooler if necessary.
–  Remove catalytic converter with centre silencer → Chapter.
  W00-10427
–  Remove bolts -1 and 3-.
–  Release hose clip -2-, detach air pipe (top right) and remove air hose.
  A21-10567
–  Unplug electrical connector -2-.
–  Detach vacuum hoses -1-.
  A21-10570
–  Unscrew bolts -arrows- and remove retaining plate -1-.
  A21-10615
–  Remove bolts -arrows- and ball stud -1-.
  Note
Place a cloth underneath to catch escaping coolant.
–  Disconnect coolant lines from turbocharger, lift clear and tie up.
  A19-11323
–  Remove banjo bolts -arrows- on valve timing housing and turbocharger and detach oil supply line.
  N21-10225
–  Remove bolts -arrows- and detach oil return line -1- for turbocharger.
  A21-10595
–  Remove nuts in the sequence: -9 ... 1- and detach turbocharger with exhaust manifold.
  Note
Seal off open pipes/lines and connections on turbocharger with clean plugs or protective caps to prevent dirt from entering.
Installing
Installation is carried out in the reverse order; note the following:
Tightening torques
l  → Chapter „Turbocharger - exploded view“.
l  → Chapter „Charge air cooler - exploded view“.
l  → Fig. „„Turbocharger - tightening torque and sequence““.
  Note
t  Renew seals, gaskets, O-rings and self-locking nuts.
t  Fill turbocharger with engine oil at connection for oil supply line.
t  After installing the turbocharger, allow the engine to idle for approx. 1 minute without pressing the accelerator to ensure that the turbocharger is supplied with oil.
–  Install air pipe (top right) → Chapter.
–  Install air hoses with screw-type clips → Fig..
–  Install catalytic converter with centre silencer → Chapter.
–  Check oil level → Booklet819.
–  Check coolant level → Anchor.
  A21-10622

Supercharger > < Adjusting vacuum unit for turbocharger