audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Removing and installing turbocharger air recirculation valveN249 > < Turbocharger
Turbocharger - exploded view
   
Turbocharger - exploded view
Part 1
1 - Overrun cut-off valve -N65-
2 - Bolt
q   10 Nm
3 - Bolts
q   11 Nm
4 - Turbocharger air recirculation valve -N249-
q   Removing and installing → Chapter
5 - O-ring
q   Renew
6 - Turbocharger
q   Combined with exhaust manifold
q   Removing and installing → Chapter
q   Checking vacuum unit for turbocharger → Chapter
q   Removing and installing vacuum unit for turbocharger → Chapter
q   Adjusting vacuum unit for turbocharger → Chapter
7 - Hose
8 - Hose

   
Part 2
1 - Bolt
q   9 Nm
2 - Oil return line
3 - O-ring
q   Renew
4 - Bolt
q   9 Nm
5 - O-rings
q   Renew
6 - Nut
q   Secure with sealing paint after tightening
q   9 Nm
7 - Vacuum unit for turbocharger
q   Checking → Chapter
q   Removing and installing → Chapter
q   Adjusting → Chapter
8 - Bolt
q   9 Nm
9 - Banjo bolt
q   Renew
q   30 Nm
10 - Seals
q   Renew
11 - Oil supply line
12 - Seals
q   Renew
13 - Banjo bolt
q   Renew
q   30 Nm
14 - Bolt
q   9 Nm
15 - Air pipe (top right)
16 - O-ring
q   Renew
17 - Turbocharger
q   Combined with exhaust manifold
q   Removing and installing → Chapter
18 - Bolt
q   20 Nm
19 - Nut/bolt
q   For heat shield
q   9 Nm
20 - Threaded pin
q   9 Nm
21 - Bracket
q   For turbocharger
22 - Gasket
q   Renew
23 - Nut
q   Tightening torque and sequence → Fig.
24 - Nut
q   Secure with sealing paint after tightening
q   9 Nm
25 - Ball stud
q   For engine cover
q   9 Nm
26 - Coolant return hose/pipe
27 - Bolt
q   23 Nm
28 - Coolant supply line
29 - Gasket
q   Renew

   
Turbocharger - tightening torque and sequence
  Note
Renew the nuts.
–  Tighten nuts in 2 stages in the sequence shown:
  A21-10622
StageNutsTightening torque
1.-1 … 9-Screw in nuts by hand until they make contact
2.-1 … 9-25 Nm

   

Removing and installing turbocharger air recirculation valveN249 > < Turbocharger