–
| Note position of indicator -left arrow- on tensioning roller and push in toothed belt with firm thumb pressure -right arrow-. |
l
| The indicator must move to the side. |
–
| Release tension on toothed belt. |
–
| Turn crankshaft 2 rotations in direction of engine rotation. |
–
| Check position of indicator on tensioning roller. |
l
| The indicator must move back to its normal position. |
–
| Renew the tensioning roller if the indicator does not return to its previous position. |
Installation is carried out in the reverse order; note the following: |
–
| Install poly V-belt pulley for crankshaft → Chapter. |
|
|
|