audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Canister Purge Control Valve|Testing and Inspection|Page 7296 > < Canister Purge Control Valve|Testing and Inspection|Page 7294
Page 3
background image

-

Using a Multimeter , check the electrical harness connector for voltage.

Evaporative Emission (EVAP)

Measure to

Canister Purge Regulator
Valve N80 electrical harness
connector terminal
2

Battery positive (+)

-

Operate the starter briefly.

Specified value: battery voltage.

-

Switch the ignition off.

If the specified value was not obtained:

If the manufacturers test box is being used. Perform the following step.

-

Install the test box.

If the manufacturers test box is not being used. Perform the following step.

-

Remove the Motronic Engine Control Module (ECM) J220.

-

Using a Multimeter , check the Evaporative Emission (EVAP) Canister Purge Regulator Valve N80 electrical connector terminal 2 to Motronic
Engine Control Module (ECM) J220 electrical connector T60 terminal 5 for an open circuit.

Evaporative Emission (EVAP)

Motronic Engine Control Module

Canister Purge Regulator

(ECM) J220 electrical connector

Valve N80 electrical harness

T60 terminal test box socket

connector terminal
2

5

Specified value: 1.5 Ohms max.

If the specification is not obtained:

-

Check the wiring for a short circuit to Battery positive (+) or an open circuit.

-

Check the electrical harness connector for damage, corrosion, lose or broken terminals.

-

If necessary, repair the wiring connection.

If the specification was obtained:

-

Replace the Motronic Engine Control Module (ECM) J220.

Canister Purge Control Valve|Testing and Inspection|Page 7296 > < Canister Purge Control Valve|Testing and Inspection|Page 7294