audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

02E 6 Speed DSG A/T FWD|Page 4460 > < A/T - No Acceleration When Selecting 'D,R,S' From Park|Page 4457
Page 1
background image

Shifter A/T: Testing and Inspection
02E 6 Speed DSG A/T FWD

Selector Lever Voltage Supply, Checking

Special tools, testers and auxiliary items required

-

multimeter.

-

Wiring diagram.

Test requirements 

-

The Direct Shift Gearbox (DSG) Mechatronic J743 fuses OK.

-

Battery voltage at least 12.5 volts.

-

All electrical consumers such as, lights and rear window defroster, switched off.

-

Selector lever in "P".

-

A/C switched off.

-

Ground (GND) connections between engine/transmission/chassis OK.

-

Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint.   See: Powertrain Management/Computers and Control Systems/Testing and
Inspection/Scan Tool Testing and Procedures/Preliminary Check

Start diagnosis

-

Remove the selector mechanism, far enough to gain access to the Selector Lever E313 electrical harness connector - A -.

-

Disconnect the Selector Lever E313 electrical harness connector - A -.

Checking voltage supply, terminal 30

-

Using a multimeter, check the Selector Lever E313 electrical harness connector terminals 10 to 1 for voltage.

Specified value: battery voltage.

If the specified value was not obtained:

-

Check the wiring connection for an open circuit, short circuit to Battery (+) or Ground (GND).

-

Check the wiring connection for damage, corrosion, loose or broken terminals.

-

If necessary, repair the faulty wiring connection.

If the specified value was obtained:

02E 6 Speed DSG A/T FWD|Page 4460 > < A/T - No Acceleration When Selecting 'D,R,S' From Park|Page 4457