A3 Mk2
Exploded view - output shaft |
Note
t | The output shaft is dismantled as follows:- Position splitter under 2nd speed selector gear ( → Item) and press off as described in → Fig.. Remove circlip → Item. Then press off locking collar and synchro-hub for 1st and 2nd gear as shown in → Fig.. |
t | Refer to general repair instructions → Chapter. |
t | Refer to → Electronic parts catalogue and technical data → Chapter when installing new gears or a new output shaft. |
t | Always renew both tapered roller bearings together. |
1 - | Nut |
q | 25 Nm + 90° |
q | 4 nuts for bearing mounting |
q | Always renew |
2 - | Clutch housing |
3 - | Shim |
q | For output shaft |
q | Table of adjustments → Chapter |
4 - | Small tapered roller bearing outer race |
q | Removing → Fig. |
q | Pressing in → Fig. |
5 - | Small tapered roller bearing inner race |
q | Pulling off → Fig. |
q | Pressing on → Fig. |
6 - | Output shaft |
q | Adjusting → Chapter |
7 - | Large tapered roller bearing inner race |
q | Pulling off → Fig. |
q | Pressing on → Fig. |
8 - | Seal |
q | Place seals (4x) on bolts for bearing mounting |
9 - | Bearing mounting |
q | With large tapered roller bearing outer race and bolts |
q | Only renew outer race together with large tapered roller bearing and bearing mounting |
10 - | Thrust washer |
q | Shoulder on thrust washer faces towards tapered roller bearing |
11 - | 1st speed selector gear |
12 - | Needle bearing |
q | For 1st gear |
13 - | Synchro-ring |
q | (Inner ring for 1st gear) |
q | Installation position → Fig. |
q | Checking for wear → Fig. |
q | Check lugs for scoring |
14 - | Outer ring for 1st gear |
q | Installation position → Fig. |
q | Checking for wear → Fig. |
q | Renew if scored or if there are visible traces of wear |
15 - | 1st gear synchro-ring |
q | Installation position → Fig. |
q | Checking for wear → Fig. |
16 - | Locking collar with synchro-hub for 1st and 2nd gear |
q | Press off together with bearing mounting → Item after removing circlip → Fig. |
q | Dismantling → Fig. |
q | Assembling locking collar/synchro-hub → Fig., → Fig. and → Fig. |
q | Installation position → Fig. |
q | Pressing on → Fig. |
17 - | Circlip |
18 - | 2nd gear synchro-ring |
q | Checking for wear → Fig. |
q | Assemble so that the recesses engage on the locking pieces on the locking collar → Item |
19 - | Outer ring for 2nd gear |
q | Insert in synchro-ring → Item |
q | Installation position → Fig. |
q | Renew if scored or if there are visible traces of wear |
20 - | Synchro-ring |
q | (Inner ring for 2nd gear) |
q | Checking for wear → Fig. |
q | Check lugs for scoring |
q | Installation position → Fig. |
21 - | 2nd speed selector gear |
q | Installation position → Fig. |
22 - | Needle bearing |
q | For 2nd gear |
23 - | Thrust washer |
24 - | Sleeve for 3rd gear needle bearing |
q | Pressing off with 2nd speed selector gear → Fig. |
q | Pressing on → Fig. |
25 - | Needle bearing |
q | For 3rd gear |
26 - | 3rd speed selector gear |
27 - | 3rd gear synchro-ring |
q | Checking for wear → Fig. |
28 - | Locking collar with synchro-hub for 3rd and 4th gear |
q | Pressing off with 2nd speed selector gear → Item and 3rd speed selector gear → Item → Fig. |
q | Dismantling → Fig. |
q | Assembling locking collar/synchro-hub → Fig., → Fig. and → Fig. |
q | Installation position: Locking collar/synchro-hub → Fig. |
q | Pressing on → Fig. |
29 - | Sleeve |
q | For 4th gear needle bearing |
q | Pressing off with locking collar and synchro-hub for 3rd and 4th gear → Item → Fig. |
q | Pressing on → Fig. |
30 - | Needle bearing |
q | For 4th gear |
31 - | 4th gear synchro-ring |
q | Checking for wear → Fig. |
32 - | 4th speed selector gear |
33 - | Thrust washer |
34 - | Needle bearing |
q | For output shaft |
q | Removing and installing → Fig. |
35 - | Gearbox housing |
36 - | Sleeve |
q | For needle bearing/output shaft |
q | Pressing off → Fig. |
q | Pressing on → Fig. |
37 - | 5th gear wheel |
q | Pulling off individually → Chapter |
q | Pulling off together with gearbox housing → Chapter |
38 - | Sleeve |
39 - | 6th gear wheel |
q | Pulling off individually → Chapter |
q | Pulling off together with gearbox housing → Chapter |
40 - | Roller bearing inner race |
q | For output shaft |
q | Larger outer diameter on gearboxes manufactured from 21 08 6 onwards |
q | Allocation → Fig. |
q | Mark before removing |
q | Do not interchange with roller bearing inner race for input shaft |
41 - | Bolt |
q | Tightening torque → Item |
q | Allocation of bolts → Fig. |
q | For output shaft |
q | Self-locking |
q | Always renew |