audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Removing and installing coolant pipe (front) - vehicles with 4/2-way valve > < Removing and installing pump for exhaust gas recirculation coolerV400
Removing and installing coolant pipe (front) - vehicles with thermostat
Removing and installing coolant pipe (front) - vehicles with thermostat
Special tools and workshop equipment required
   
t  Removal lever -80 - 200-
  W00-0353
t  Hose clip pliers -VAS 6362-
  W00-10427
Removing
–  Remove oil filter bracket with engine oil cooler → Chapter.
–  Remove battery → Electrical system; Rep. gr.27.
  A27-0193
–  Remove bolts -arrows- and take out battery tray -1-.
  A27-10166
–  Press release tabs and disconnect crankcase breather hose -1- from cylinder head cover.
–  Move clear vacuum hoses -arrows- at air pipe.
–  Remove bolt -2-, swivel air hose with connection to rear and detach from turbocharger.
  A21-10487
–  Unclip wiring harness from retainer -arrow-.
  N15-10410
–  Move clear wiring harnesses -arrows- and electrical connector -1- at bracket.
  A10-11009
–  Remove bolts -2, 5- and -arrows-.
–  Using removal lever -80 - 200-, move clear electrical wiring and hoses at air pipe (left-side).
–  Loosen hose clip -3- and detach air pipe (left-side).
  Note
Disregard -items 1, 4-.
  A21-10493
–  Release hose clips -1- and detach coolant hoses.
  Note
Disregard -items 2, 3, 4-.
  A19-10975
–  Remove electrical connector -2- for Hall sender -G40- from bracket and unplug connector.
–  Detach bracket from coolant pipe (front).
–  Release hose clips -1- and -3- and disconnect coolant hoses.
–  Remove bolts -arrows- and detach coolant pipe (front) from left side of cylinder block.
Installing
Installation is carried out in the reverse order; note the following:
l  Tightening torques → Chapter „Coolant pipes, coolant temperature senders, coolant circulation pump - exploded view“
  Note
t  Renew gaskets, seals and O-rings.
t  Hose connections and air pipes and hoses must be free of oil and grease before assembly.
t  Secure all hose connections with the correct type of hose clips (same as original equipment) → Electronic parts catalogue.
–  Clean and smoothen sealing surface for O-ring.
–  Lightly lubricate O-ring with coolant and slide O-ring onto coolant pipe (front).
–  Push coolant pipe (front) into cylinder block.
–  Install air pipe → Chapter.
–  Install air hoses with screw-type clips → Fig..
–  Install intake connecting pipe → Chapter.
–  Install battery mounting and battery → Electrical system; Rep. gr.27.
–  Install oil filter bracket with engine oil cooler → Chapter.
–  Fill up with coolant → Anchor.
  A19-10644

Removing and installing coolant pipe (front) - vehicles with 4/2-way valve > < Removing and installing pump for exhaust gas recirculation coolerV400