Audi Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Removing and installing coolant pipe (front) - vehicles with 4/2-way valve >
< Removing and installing pump for exhaust gas recirculation coolerV400
A3 Mk2
Power unit
4-cylinder TDI engine (1.6 ltr. 4-valve common rail), mechanics
Engine cooling
Coolant pipes, coolant temperature senders, coolant circulation pump
Removing and installing coolant pipe (front) - vehicles with thermostat
Removing and installing coolant pipe (front) - vehicles with thermostat
Removing and installing coolant pipe (front) - vehicles with thermostat
Special tools and workshop equipment required
t
Removal lever -80 - 200-
t
Hose clip pliers -VAS 6362-
Removing
–
Remove oil filter bracket with engine oil cooler
→ Chapter
.
–
Remove battery
→ Electrical system; Rep. gr.27
.
–
Remove bolts
-arrows-
and take out battery tray
-1-
.
–
Press release tabs and disconnect crankcase breather hose
-1-
from cylinder head cover.
–
Move clear vacuum hoses
-arrows-
at air pipe.
–
Remove bolt
-2-
, swivel air hose with connection to rear and detach from turbocharger.
–
Unclip wiring harness from retainer
-arrow-
.
–
Move clear wiring harnesses
-arrows-
and electrical connector
-1-
at bracket.
–
Remove bolts
-2, 5-
and
-arrows-
.
–
Using removal lever -80 - 200-, move clear electrical wiring and hoses at air pipe (left-side).
–
Loosen hose clip
-3-
and detach air pipe (left-side).
Note
Disregard
-items 1, 4-
.
–
Release hose clips
-1-
and detach coolant hoses.
Note
Disregard
-items 2, 3, 4-
.
–
Remove electrical connector
-2-
for Hall sender -G40- from bracket and unplug connector.
–
Detach bracket from coolant pipe (front).
–
Release hose clips
-1-
and
-3-
and disconnect coolant hoses.
–
Remove bolts
-arrows-
and detach coolant pipe (front) from left side of cylinder block.
Installing
Installation is carried out in the reverse order; note the following:
l
Tightening torques
→ Chapter „Coolant pipes, coolant temperature senders, coolant circulation pump - exploded view“
Note
t
Renew gaskets, seals and O-rings.
t
Hose connections and air pipes and hoses must be free of oil and grease before assembly.
t
Secure all hose connections with the correct type of hose clips (same as original equipment)
→ Electronic parts catalogue
.
–
Clean and smoothen sealing surface for O-ring.
–
Lightly lubricate O-ring with coolant and slide O-ring onto coolant pipe (front).
–
Push coolant pipe (front) into cylinder block.
–
Install air pipe
→ Chapter
.
–
Install air hoses with screw-type clips
→ Fig.
.
–
Install intake connecting pipe
→ Chapter
.
–
Install battery mounting and battery
→ Electrical system; Rep. gr.27
.
–
Install oil filter bracket with engine oil cooler
→ Chapter
.
–
Fill up with coolant
→ Anchor
.
Power unit
4-cylinder TDI engine (1.6 ltr. 4-valve common rail), mechanics
Engine cooling
Coolant pipes, coolant temperature senders, coolant circulation pump
Removing and installing coolant pipe (front) - vehicles with thermostat
Removing and installing coolant pipe (front) - vehicles with 4/2-way valve >
< Removing and installing pump for exhaust gas recirculation coolerV400