–
| Remove bolts -2, 5- and -arrows-. |
–
| Using removal lever -80 - 200-, move clear electrical wiring and hoses at air pipe (left-side). |
–
| Loosen hose clip -3- and detach air pipe (left-side). |
–
| Place drip tray for workshop hoist -VAS 6208- beneath engine. |
–
| Clamp off coolant hoses using hose clamps -3094-, release hose clips -1- and -4- and disconnect coolant hoses from coolant pipe (left-side). |
–
| Detach coolant pipe (left-side). |
Installation is carried out in the reverse order; note the following: |
Note
|
|
|