–
| Unbolt coolant pipe -1- (if fitted) from cylinder head. |
Note The nuts on the fastening strip (bottom) do not have to be loosened. |
–
| Unscrew top nuts -arrows-. |
–
| Lift out turbocharger/exhaust manifold. |
Installation is carried out in the reverse order; note the following: |
Note t
| Renew seals, gaskets and self-locking nuts. |
t
| Fill turbocharger with engine oil at connection for oil supply pipe. |
t
| Hose connections and hoses for charge air system must be free of oil and grease before assembly. |
t
| Secure all hose connections with the correct type of hose clips (same as original equipment) → Parts catalogue. |
–
| Install exhaust system and align it free of stress → Chapter. |
Note After installing turbocharger, allow engine to idle for approx. 1 minute and do not rev up immediately to ensure turbocharger is supplied with oil. |
|
|
|