audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Cylinder block (gearbox end) > < Removing and installing vibration damper
Renewing sealing flange (pulley end) with crankshaft oil seal
Renewing sealing flange (pulley end) with crankshaft oil seal
Special tools and workshop equipment required
   
t  Pin wrench -3212-
  W00-0462
t  Assembly tool -T40048-
t  Electric drill with plastic brush attachment
t  Safety goggles
t  Sealant → Electronic parts catalogue
  W00-10103
Procedure
–  Remove vibration damper → Chapter.
–  Unbolt belt pulley from coolant pump.
–  Use pin wrench -3212- to counterhold pulley when loosening bolts.
  A13-10105
–  Remove bolts -arrows-.
–  Remove sealing flange (pulley end).
  Note
Renew sealing flange (pulley end).
  A13-10009
  Caution
Make sure that no sealant residue gets into the engine.
  WARNING
Wear safety goggles.
–  Remove sealant residue from cylinder block and sump (top section) with rotating plastic brush or similar.
–  Clean sealing surfaces; they must be free of oil and grease.
  A13-0590
–  Cut off nozzle of tube at front marking (Ø of nozzle approx. 1.5 mm).
  A17-0081
–  Apply bead of sealant onto clean sealing surface of sealing flange as illustrated.
l  The groove -arrow- on the sealing surface must be completely filled with sealant.
l  The bead of sealant must project 1.5 … 2.0 mm above the sealing surface.
  Note
t  The sealant bead must not be thicker than specified, otherwise excess sealant could enter the sump and clog the strainer in the oil pump.
t  The sealing flange (pulley end) must be installed within 5 minutes after applying silicone sealant.
  A13-10052
–  Fit assembly aid -T40048/1- onto assembly sleeve -T40048/2- and slide sealing flange -1- onto assembly sleeve.
–  Take off assembly aid.
  A13-10007
–  First position sealing flange -1- (with assembly sleeve -T40048/2- inserted) on crankshaft.
  A13-10008
–  Tighten bolts -arrows- in stages and in diagonal sequence.
Perform further installation in reverse order, paying attention to the following:
–  Install vibration damper → Chapter.
–  Install poly V-belt → Chapter.
–  Install lock carrier with attachments → Rep. Gr.50.
–  Install bumper cover (front) → Rep. Gr.63.
Tightening torques
  A13-10009
ComponentNm
Sealing flange (pulley end) to cylinder block9 1)
Poly V-belt pulley to coolant pump20
l  1) Tighten in stages and in diagonal sequence

   

Cylinder block (gearbox end) > < Removing and installing vibration damper