audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Removing and installing intake-manifold changeover system components Engine code letters: ASN, BBJ > < Dismantling and assembling air cleaner Engine code letters: ASN, BBJ
Motronic injection and ignition system (6-cyl.)
Servicing Motronic injection system
Removing and installing intake-manifold changeover system components Engine code letters: AMM, BDV
 
N24-0594
  • Vacuum actuator
  • Spring
  • Changeover barrel
  • Intake manifold
  • Non-return valve
    • ◆ Installation position: Blue side facing Y-piece
  • Y-piece
  • Intake manifold changeover valve
    -N156
 
N24-0594
  • 10 Nm
  • Securing plate
  • Rubber grommet
  • Spacer sleeve
  • Washer
    • ◆ Tapered side facing intake manifold
  • Sealing ring
    • ◆ Replace if damaged
  • Sealing ring
    • ◆ For changeover barrel
    • ◆ Replace if damaged
  • 6 Nm

Removing and installing intake-manifold changeover system components Engine code letters: ASN, BBJ > < Dismantling and assembling air cleaner Engine code letters: ASN, BBJ