A4 Mk1
Checking lambda control
Checking lambda probe heating
|
→ Indicated on display: |
|
||
If the specification is not obtained:
|
If the specification is not obtained:
=> "Current Flow Diagrams, Electrical Fault Finding and Fitting Locations" binder If the specification is obtained:
|
The following wiring connections should be checked for open circuits and/or short to positive or negative.
|