–
| Remove bolts -2- and -3-. |
–
| Push coolant pipe (right-side) -1- to rear and detach. |
Installation is carried out in the reverse order; note the following: |
Note Renew gaskets, O-rings and self-locking nuts. |
–
| Before installing, clean and smoothen sealing surface for O-ring. |
–
| Lubricate new O-ring with “G12+” and slide onto coolant pipe. |
–
| Push coolant pipe (right-side) into bores on cylinder block. |
|
|
|