No. | Operating sequence |
1 | OFF signal |
| Auxiliary heating:l
| Signal from operating and display unit, Climatronic control unit -J255- (via data bus, setting is made on MMI). |
l
| Signal from auxiliary heating radio controlled receiver -R64- |
|
| Supplementary heater (for vehicles with diesel engine without supplementary air heater element -Z35- only):l
| Signal from operating and display unit, Climatronic control unit -J255- (by way of data bus). |
l
| Signal from vehicle diagnostic, testing and information system -VAS 5051/- (by way of basic setting function) |
|
2 | Burn-off / run-on (cooling down of heater) |
| l
| No deviations in measured values and components monitored → Chapter. |
|
| 2.1 | Diesel |
| | –
| Increase in voltage at combustion air blower -V6-. |
–
| Deactivation of metering pump -V54-. |
–
| Voltage at glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6-. | 6 to 9 V | 20 sec. |
| | Metering pump -V54-. | 0 Hz | - |
| | Glow plug for heater -Q9- (post-glow, regulated). | approx. 8 V | 20 sec. |
| | –
| Deactivation of glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- | approx. 9 V | 100 sec. |
| | Metering pump -V54-. | 0 Hz | - |
| | Glow plug for heater -Q9- (post-glow, regulated). | 0 V | - |
| –
| Deactivation of circulation pump -V55- and heater coolant shut-off valve -N279-. |
|
| 2.2 | Petrol |
| | l
| No deviations in measured values and components monitored → Chapter. |
|
| | –
| Increase in voltage at combustion air blower -V6-. |
–
| Deactivation of metering pump -V54-. |
–
| Deactivation of glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6-. | approx. 9 V | 0 to 120 sec. |
| | Metering pump -V54-. | 0 Hz | - |
| | Glow plug for heater -Q9-. | 0 V | - |
| –
| Deactivation of circulation pump -V55- and heater coolant shut-off valve -N279-. |
|