audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Activation of auxiliary heating > < Operating sequence
Requirements for the sequence described on the following pages
Requirements for the sequence described on the following pages
These requirements must be fulfilled on switching on the heater.
l  Coolant circuit bled
l  Battery -A- adequately charged
l  Sufficient fuel in tank.
l  No fault stored in the heater event recorder.
l  Ignition off and “auxiliary heating” mode set
  Note
t  Only the main features of the operating sequence are outlined on the following pages.
t  Certain procedures taking place during auxiliary heater operation are not perceptible (audible or measurable) → Chapter.
t  Depending on vehicle equipment, the circulation pump -V55- may also be actuated when requested by the corresponding engine control unit and the operating and display unit, Climatronic control unit -J255- → Chapter and → Vehicle diagnostic, testing and information systemVAS 5051/, “Guided fault-finding function”.
t  The heater coolant shut-off valve -N279- may, depending on the coolant temperature and the setting on the operating and display unit, Climatronic control unit -J255-, also be actuated with the auxiliary heater switched off → Chapter and → Vehicle diagnostic, testing and information systemVAS 5051/, “Guided fault-finding function”.
t  On the Audi Q5, actuation of -N279- is only permissible up to a certain engine speed (currently up to approx. 1200 rpm). Attention is therefore to be paid to the correct version, encoding and adaption of the auxiliary heater → Vehicle diagnostic, testing and information systemVAS 5051/, “Guided fault-finding function”.
t  The voltages, times and frequencies given in the table are approximate values regulated by the control unit on the basis of measured values (voltage, temperature etc.).
t  1 hertz (Hz) corresponds to 1 pulse per second.
   

Activation of auxiliary heating > < Operating sequence