Audi Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Balance shaft timing chain - exploded view >
< Camshaft timing chain - exploded view
A4 Mk3
Power unit
4-cylinder direct petrol injection engine (1.8 ltr., 2.0 ltr. 4-valve turbo), mechanics
Engine cylinder head, valve gear
Chain drive
Removing and installing camshaft timing chain
Removing and installing camshaft timing chain
Removing and installing camshaft timing chain
Special tools and workshop equipment required
t
Locking tool -T40098-
t
Counterhold tool -T10355-
t
Assembly tool -T10352- and assembly tool -T10352/1-
t
Locking pin -T40011-
Removing
–
Remove bumper cover (front) and bumper
→ Rep. gr.63
.
–
Perform service position
→ Rep. gr.50
.
–
Remove timing chain cover (top)
→ Chapter
.
Caution
The timing valve has a left-hand thread.
–
Depending on version, turn assembly tool -T10352- or assembly tool -T10352/1- in direction of
-arrow-
to remove timing valve.
–
Remove bolts
-arrows-
and detach bearing saddle.
–
Turn vibration damper to „TDC“ position
-arrow-
using counterhold tool -T10355-.
l
Notch on vibration damper must align with arrow marking on cover for timing chains (bottom).
l
The markings
-1-
on the camshafts must face upwards.
–
Remove timing chain cover (bottom)
→ Chapter
.
–
Press oil pump chain tensioner in direction of
-arrow-
and lock in place using locking pin -T40011-.
–
Remove oil pump chain tensioner
-1-
.
–
Remove oil pump chain.
–
Insert scriber or suitable screwdriver in hole of chain tensioner in direction of
-arrow 1-
and lift locking element for chain tensioner.
–
Press tensioning rail for timing chain in direction of
-arrow 2-
and lock in place using locking pin -T40011-.
–
Detach camshaft timing chain from cylinder head.
Note
Inlet camshaft will move in direction of engine rotation.
–
Remove tensioning rail for timing chain
-2-
.
–
Remove guide rail for camshaft timing chain
-1-
.
–
Remove timing chain.
Installing
l
Tightening torque
→ Chapter „Camshaft timing chain - exploded view“
Note
t
The following procedure must be performed in continuous sequence. This requires the assistance of a 2nd person.
t
The timing chain links with coloured markings must be positioned at the markings on the chain sprockets.
t
Hold spanner in position until tensioning rail is installed.
–
Fit timing chain onto exhaust camshaft.
–
Fit timing chain onto crankshaft.
–
Use spanner to turn inlet camshaft in direction of
-arrow-
and fit timing chain.
–
Fit tensioning rail for timing chain and tighten bolt
-2-
.
–
Fit guide rail for camshaft timing chain and tighten bolts
-1-
.
–
Attach bearing saddle and screw in bolts
-arrows-
hand-tight.
–
Remove locking pin -T40011-.
–
Tighten bolts
-arrows-
for bearing saddle
→ Chapter
.
–
Install timing valve
→ Item
.
Further assembly is basically carried out in reverse order of dismantling. Note the following:
–
Install timing chain cover (bottom)
→ Chapter
.
–
Install timing chain cover (top)
→ Chapter
.
–
Install poly V-belt tensioner
→ Chapter
.
–
Install poly V-belt
→ Chapter
.
–
Reset service position
→ Rep. gr.50
.
–
Install front bumper and bumper cover
→ Rep. gr.63
.
Power unit
4-cylinder direct petrol injection engine (1.8 ltr., 2.0 ltr. 4-valve turbo), mechanics
Engine cylinder head, valve gear
Chain drive
Removing and installing camshaft timing chain
Balance shaft timing chain - exploded view >
< Camshaft timing chain - exploded view