audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Valve Body, A/T|Testing and Inspection|Page 5453 > < Transmission Position Switch/Sensor, A/T|Locations|Page 5449
Page 1
background image

Valve Body: Testing and Inspection

Voltage Supply of Direct Shift Gearbox Mechatronic, Checking

Special tools, testers and auxiliary items required

‹› multimeter.

‹› Wiring diagram.

Test requirements

‹› The Direct Shift Gearbox (DSG) Mechatronic (J743 ) fuses OK.

‹› The Power Supply Relay (terminal 15) ( J329) OK.

‹› Battery voltage at least 12.5 volts.

‹› All electrical consumers such as, lights and rear window defroster, switched off.

‹› Selector lever in "P" or "N".

‹› A/C switched off.

‹› Ground (GND) connections between engine/transmission/chassis OK.

‹› Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] See: Powertrain Management/Computers and
Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/Preliminary Check

Start diagnosis

-

Disconnect the Direct Shift Gearbox (DSG) Mechatronic (J743) electrical harness connector - 1 - by rotating counterclockwise.

Valve Body, A/T|Testing and Inspection|Page 5453 > < Transmission Position Switch/Sensor, A/T|Locations|Page 5449