audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Transmission Mount, A/T > < Customer Interest for Transmission Cooler:|380602|Page 5247
Page 1
background image

Transmission Cooler: Service and Repair

5 Spd. A/T 01V
ATF lines and ATF cooler, cleaning
 

Special tools and equipment 

^

VAG 1306 drip tray

^

Hose, approximately 18 mm

^

Compressed air gun, standard

^

Protective glasses

Notes:  
^

Always blow compressed air through oil cooler and ATF fines (maximum 10 bar) before installing a replacement transmission.

^

When installing ATF fines, insert into transmission or cooler by hand until impact first and then tighten bolts.

WARNING:  Wear protective glasses. 

-

Place VAG 1306 drip tray underneath.

-

Remove bolt -2-.

-

Disconnect ATF lines from transmission.

-

Slide a hose with approximately 18 mm diameter onto ATF line -A- and secure with hose clamp. Place the other end of the hose into an
appropriate container.

-

Blow through ATF line -13- with compressed air gun.

-

Change hose from ATF line -A- to ATF line -13- and repeat procedure.

-

Replace O-ring -1-.

-

Coat O-ring with ATF.

-

Insert ATF lines completely into transmission by hand until stop.

-

Re-secure ATF lines.

-

Then check ATF level and top off.

Transmission Mount, A/T > < Customer Interest for Transmission Cooler:|380602|Page 5247