audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Input Shaft With 6 Lining Discs Assembly Overview|Page 5725 > < Input Shaft With 6 Lining Discs Assembly Overview|Page 5723
Page 5
background image

-

Just before the input shaft is fully in position, rotate it counterclockwise over the last few millimeters so that it engages in the teeth of the helical
intermediate gearing.

-

Tighten bolts - arrows - in a diagonal sequence and in stages.

-

Fill with ATF. Refer to => [ ATF Filling for Flushing Process ] See: Continuously Variable Transmission/Transaxle/Fluid - CVT/Service and
Repair/01J Transmission/ATF Flushing.

CAUTION!
‹› The Multitronic 01J transmission requires a different ATF than shift automatics. Only ATF for CVT transmissions which can be

obtained as replacement part must be used in planetary gearing.

‹› Flush ATF after installing transmission. Refer to => [ ATF Flushing ] See: Continuously Variable Transmission/Transaxle/Fluid -

CVT/Service and Repair/01J Transmission/ATF Flushing.

Tightening Specifications

Input Shaft With 6 Lining Discs Assembly Overview|Page 5725 > < Input Shaft With 6 Lining Discs Assembly Overview|Page 5723