Audi Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Coolant pipes and continued coolant circulation pumpV51 >
< Cooling system
A5
Power unit
6-cylinder direct petrol injection engine with supercharger (3.0 ltr. 4-valve), mechanics
Engine cooling
Radiator and radiator fans
Removing water radiator (front) for charge air cooling circuit
Removing water radiator (front) for charge air cooling circuit
Special tools and workshop equipment required
t
Hose clamps for hoses up to 25 mm -3094-
t
Drip tray for workshop hoist -VAS 6208-
Removing
–
Remove lock carrier cover
-4-
→ Rep. gr.63
.
–
Remove bolts
-arrows-
.
–
Detach air duct
-1-
from intermediate flange
-2-
for air cleaner housing.
–
Remove end plate at bumper cover
→ Rep. gr.63
.
–
Remove air intake grille
-1-
on both sides
→ Rep. gr.63
.
Note
For illustration purposes, the installation position is shown in the following illustrations with the bumper removed.
–
Release catches
-arrows A-
and swivel air duct
-1-
on left and right to centre of vehicle
-arrow B-
.
–
Place drip tray for workshop hoist -VAS 6208- beneath water radiator (front) for charge air cooling circuit.
Vehicles with water radiator (front) for charge air cooling circuit (version 2):
–
Clamp off coolant hoses using hose clamps -3094-, release hose clips
-arrows-
and disconnect hoses.
Vehicles with water radiator (front) for charge air cooling circuit (version 1):
–
Clamp off coolant hose using hose clamp -3094-, release hose clip
-arrow-
and disconnect hose.
–
Remove bolt
-1-
.
–
Clamp off coolant hose using hose clamp -3094-, release hose clip
-1-
and disconnect coolant hose.
All vehicles (continued):
–
Push catch down
-arrow A-
and move water radiator (front) for charge air cooling circuit slightly in direction of
-arrow B-
.
–
Lift water radiator (front) for charge air cooling circuit off radiator
-arrows A-
and swivel in direction of
-arrow B-
.
–
Detach water radiator (front) for charge air cooling circuit from right side downwards
-arrow C-
.
Installing
Installation is carried out in the reverse order; note the following:
l
Tightening torque
→ Chapter „Radiator and radiator fans - exploded view“
Note
Secure all hose connections with the correct type of hose clips (same as original equipment)
→ Electronic parts catalogue
.
–
Install end plate at bumper cover
→ Rep. gr.63
.
–
Attach air duct to intermediate flange for air cleaner housing
→ Rep. gr.24
.
–
Install lock carrier cover
→ Rep. gr.63
.
–
Fill up with coolant
→ Anchor
.
Note
The coolant in the entire system must be changed if the radiator is renewed.
Power unit
6-cylinder direct petrol injection engine with supercharger (3.0 ltr. 4-valve), mechanics
Engine cooling
Radiator and radiator fans
Coolant pipes and continued coolant circulation pumpV51 >
< Cooling system