audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Air Injection Pump > < Left Secondary Air Injection Combination Valve|Page 8167
Page 3
background image

-

Remove air guide hoses - 3 and 4 - from above and lay them aside.

-

Remove bolts - 2 -.

-

Free up electrical wiring and remove secondary air injection (AIR) combi-valve.

‹› The engine is shown from behind to provide a better illustration.

Installing

‹› Tightening Specification => [ Secondary Air Injection System Assembly Overview ] See: Service and Repair.

Installation is in reverse order of removal, note the following:

‹› Replace seals and O-rings.

‹› Secure all hose connections using hose clamps appropriate for the model type.

‹› During installation, all cable ties must be re-installed at the same location.

-

Install stabilizer bar.

Air Injection Pump > < Left Secondary Air Injection Combination Valve|Page 8167