audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

How to Find Wiring Diagrams|Page 9061 > < How to Find Wiring Diagrams|Page 9059
Page 1
background image

Ignition Coil: Testing and Inspection

Ignition Coils with Power Output Stage, Checking

Bank 1

The following procedure is used to diagnose the Ignition Coils with Power Output Stage (N70, N127, N291, N292). 

Special tools, testers and auxiliary items required

‹› Multimeter.

‹› Diode test lamp.

‹› Wiring diagram.

Test requirements

‹› Fuse (SA2) OK.

‹› The Motronic Engine Control Module (ECM) Power Supply Relay (J271) OK.

‹› The Engine Speed (RPM) Sensor (G28) OK. 

‹› The Camshaft Position (CMP) Sensor (G40) OK. 

‹› Battery voltage at least 12.5 volts.

‹› All electrical consumers such as, lights and rear window defroster, switched off.

‹› Vehicles with automatic transmission, shift selector lever into position " P" or "N".

‹› A/C switched off.

‹› Ground (GND) connections between engine/transmission/chassis OK.

‹› Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] See: Computers and Control Systems/Testing
and Inspection/Scan Tool Testing and Procedures/Preliminary Check.

Start diagnosis

-

Remove the rear engine cover - arrows -.

How to Find Wiring Diagrams|Page 9061 > < How to Find Wiring Diagrams|Page 9059