audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

LED Test Light|Page 11283 > < LED Test Light|Page 11281
Page 1
background image

Leak Detection Pump: Testing and Inspection

Leak Detection Pump (LDP) -V144-, checking

Electrical testing of LDP -V144-

-

Disconnect harness connector for LDP -V144-.

-

Connect multimeter US 1119 (Fluke 83 or equivalent) and check resistance at leak detection pump. Specified values:
-

Terminal 1 to terminal 3: 640-720 Ohms

-

Terminal 2 to terminal 3: 11.0-21.0 Ohms

If resistance is NOT OK:

-

Replace leak detection pump -V144-.

Voltage supply, checking

-

Disconnect harness connector for LDP -V144-.

-

Connect VAG 1527B LED voltage tester between connector terminal 3 (B+) and engine Ground.

-

Start engine and run engine at idle.

LED must light up.

If LED tester does not light:

-

Check fuse for LDP -V144-.

-

Check wiring for open circuit between terminal 3 and fuse, according to wiring diagram.

Specified value: max. 0.5 Ohms

-

Check fuel pump relay and signal to relay. See: Fuel Delivery and Air Induction/Fuel Pump/Fuel Pump Relay/Testing and Inspection 

LED Test Light|Page 11283 > < LED Test Light|Page 11281