A8 Quattro Sedan V8-4.2L (BFM) (2005)
Intake Manifold: Testing and Inspection
Intake Manifold Change-Over Valve, Checking
Intake Manifold Change-Over Valve, Checking
Overview: Intake manifold change-over
Electrical Test
-
Disconnect connector from Intake Manifold Change-Over Valve (N156).
-
Perform a resistance measurement between the valve terminals using portable multimeter (VAG1526).
Specified value: 25 to 35 ohms
If specified value is not obtained.
-
Replace Intake Manifold Change-Over Valve (N156).
If specified value is obtained.
-
Check voltage supply.
Voltage Supply, Checking
-
Connect voltage test lamp (VAG1527) between connector terminal 2 and engine Ground (GND) using adapter cables from connector test kit
(VAG1594).