A8L V8-4.2L (BFM) (2004)
‹› If generator is stuck in its bracket, screw in mounting bolts again except 2 rotations.
‹› Carefully strike on bolt heads using flat side of hammer - doing this loosens sleeves of generator mount.
Installing
Install in reverse order of removal, observing the following:
‹› Secure all hose connections using standard hose clamps.
-
slightly drive back sleeves for retaining bolts in order for easier installation of generator.
‹› Tight sleeves for generator mount must be made smooth-running, otherwise clamping force of sleeve is too little despite correct torque.
-
Place ribbed belt - 2 - over belt pulleys in the specified sequence.
1
Generator
3
Idler pulley
4
Vibration damper
5
Tension roller
‹› When installing poly V-belt, make sure it is properly seated on pulleys.
-
Connect battery. Required actions, refer to => [ To connect, connect terminal clamp of ground (GND) wire by hand to battery negative terminal
and tighten nut. ] See: Tools and Equipment/Battery, Disconnecting and Connecting.
-
Check coolant level.
-
Start engine and check belt routing.