audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Air Injection Control Valve|Service and Repair > < Secondary Air Injection Combination Valve, Checking|Page 7466
Page 1
background image

Air Injection Control Valve: Testing and Inspection
Secondary Air Injection Combination Valves, Checking for Function and Leaks

Secondary Air Injection Combination Valves, Checking for Function and Leaks

Test Sequence

-

Disconnect pressure hose - 1 - at combination valve for secondary air injection.

‹› Ignore - arrows -.

Connect an appropriate assisting hose to the combination valve.

-

Blow into the assisting hose using light pressure (do not use pressurized air).

‹› Combination valve must be closed, it must not be possible to blow through.

-

Blow into the assisting hose using higher pressure (do not use pressurized air).

‹› The combination valve must open, it must be possible to blow through.

If the switching point is not recognized:

-

Replace combination valve: Left => [ Left Combination Valve for Secondary Air Injection ] See: Service and Repair/Left Combination Valve for
Secondary Air Injection, right => [ Right Combination Valve for Secondary Air Injection ] See: Service and Repair/Right Combination Valve for
Secondary Air Injection.

Air Injection Control Valve|Service and Repair > < Secondary Air Injection Combination Valve, Checking|Page 7466