audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

How to Find Wiring Diagrams|Page 7496 > < How to Find Wiring Diagrams|Page 7494
Page 5
background image

-

Check the wire for short circuit to B+ and Ground (GND). Specification: infinite ohms

-

Check wire between 2-pin connector terminal 1 and Ground (GND) for open circuit according to wiring diagram. Wiring resistance: max. 1.5
ohms 

-

Erase DTC memory of Engine Control Module (ECM) => [ Diagnostic Mode 04 - Erase DTC Memory ] See: Computers and Control
Systems/Testing and Inspection/Scan Tool Testing and Procedures/Diagnostic Modes 01 - 09, Diagnostic mode 4: Reset/erase diagnostic data.

-

Generate readiness code => [ Readiness Code, Generating ] See: Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive
Cycles and Readiness Codes.

If no malfunction is detected in the wiring:

Cylinder bank 1

-

Replace Engine Control Module (ECM) (J623), 

Cylinder bank 2

-

Replace E ngine Control Module (ECM) 2 (J624), 

How to Find Wiring Diagrams|Page 7496 > < How to Find Wiring Diagrams|Page 7494