audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

How to Find Wiring Diagrams|Page 8082 > < How to Find Wiring Diagrams|Page 8080
Page 3
background image

-

Check wires between 4-pin connector and Ground (GND) for open circuit according to wiring diagram. Terminal 2 and Ground (GND) terminal 4
and Ground (GND) wire resistance: max. 1.5 ohms

-

Erase DTC memory of Engine Control Module => [ Diagnostic Mode 04 - Erase DTC Memory ] See: Computers and Control Systems/Testing
and Inspection/Scan Tool Testing and Procedures/Diagnostic Modes 01 - 09, Diagnostic mode 4: Reset/erase diagnostic data.

-

Generate readiness code => [ Readiness Code, Generating ] See: Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive
Cycles and Readiness Codes.

If there is no malfunction in the voltage supply:

-

Check activation.

Check activation 

-

Remove fuses 29 and 30 for fuel injectors 1 to 12 from fuse holder. 

-

 Fuse holder in right of instrument panel.

-

Connect voltage tester with adapter cables to terminal 3 + engine Ground (GND) on the disconnected connector for Ignition Coil 1 with Power
Output Stage (N70), cylinder 1.

How to Find Wiring Diagrams|Page 8082 > < How to Find Wiring Diagrams|Page 8080