audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Camshaft, Engine|Testing and Inspection|Page 3065 > < Camshaft, Engine|Testing and Inspection|Page 3063
Page 5
background image

‹› Note the expiration date of the sealing compound.

-

Cut the tube nozzle at the front marking (nozzle diameter approximately 2.0 mm).

-

Rotate guide frame again.

Camshaft, Engine|Testing and Inspection|Page 3065 > < Camshaft, Engine|Testing and Inspection|Page 3063