Q5 Quattro V6-3.2L (CALB) (2009)
-
Pivot the data bus on board diagnostic interface (J533) - item 3 - out of the bracket - arrow -.
-
Disconnect the electrical connector - 4 -.
-
Disconnect the fiber optic cable connector - 1 -.
-
Seal open wiring harness fiber optic connector - 2 - with Wiring Harness Connector Protective Cap (VAS 6223/9) - item 1 -.
‹› Protective cap prevents contamination of or mechanical damage to end face of fiber optic cable which would impair signal transmission.
Installing
‹› Tightening specification. Refer to => [ Instrument Cluster RF Controlled Clock Receiver Assembly Overview ] See: Instrument Panel, Gauges and
Warning Indicators/Instrument Cluster / Carrier/Service and Repair/Instrument Cluster RF Controlled Clock Receiver Assembly Overview.
Install in reverse order of removal, observing the following:
-
Install glove compartment.
-
Follow the instructions on the (VAS 5051B) display with a new Data Bus on board diagnostic interface (J533 ).