audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Secondary Air Combination Valves, Checking Function and Leakage|Page 4805 > < Secondary Air Combination Valves, Checking Function and Leakage|Page 4803
Page 3
background image

Specified value: battery voltage.

Switch the ignition off.

If the specified value was not obtained:

-

Check the wiring from the Secondary Air Injection (AIR) Solenoid Valve 2 (N320) electrical connector terminal 1 to the Secondary Air Injection
(AIR) Pump Relay (J299) terminal 4 for an open circuit.

-

Check the electrical harness connector for damage, corrosion, lose or broken terminals.

-

If necessary, repair the wiring connection.

If no malfunctions are found in the wiring:

Checking wiring

If the manufacturers test box is being used. Perform the following step.

-

Install the test box. 

If the manufacturers test box is not being used, perform the following step.

-

Remove the Motronic Engine Control Module (ECM) ( J623). Using a multimeter, check the Secondary Air Injection (AIR) Solenoid Valve 2 (
N320) electrical harness connector terminal 2 to the Motronic Engine Control Module (ECM) (J623) electrical harness connector T60 terminal 9
for an open circuit.

Secondary Air Combination Valves, Checking Function and Leakage|Page 4805 > < Secondary Air Combination Valves, Checking Function and Leakage|Page 4803