audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Refrigerant Lines, Loosening and Assembling Connection Points|Page 4439 > < Refrigerant Lines, Loosening and Assembling Connection Points|Page 4437
Page 2
background image

-

Remove bolts - A - and disconnect refrigerant lines - B - and - C -.

-

Mark the arrangement of coolant hoses - D - and - E - in retaining plate - F - and then remove them.

Installing 

-

Check seal on under side of retaining plate - F - for damage (seal at body) and install it (tightening torque of bolts 10 Nm).

-

Replace O-ring seals on refrigerant lines to retaining plate (version Parts Catalog, installing

-

Install refrigerant lines on retaining plate (tightening torque of bolts 10 Nm.

-

Install refrigerant hoses - D - and - E - in retaining plate - F -, while doing this check for correct assignment and correct fit in retaining plate.

-

Connect coolant hose - A - to coolant pipe - E - (coolant hose - B - is not connected for the time being).

NOTE:  Connect coolant hoses on proper side, coolant hose - A - supply from engine (via pipe group under left fender) and coolant hose - B -
return to engine (via pipe group under left fender).

-

Fill coolant into coolant expansion tank up to top marking.

-

Extend coolant hose - B - and hold it in such a way that it ends approximately at the height of the heater core.

-

Open Hose Clamps Up to 25mm dia. 3094 on coolant hose - B -.

-

Increase pressure in coolant expansion tank e.g. using hand pump of Cooling System Tester VAG1274 enough that coolant can stream slowly into
heater core (to pre-bleed the heater core).

NOTE: 
-

By pre-bleeding the coolant circuit, bleeding of the cooling system after installation is greatly simplified on first starting in operation.

-

Bleed coolant circuit

-

Wait until coolant exits from extension for coolant hose - B -.

-

Clamp off coolant hose - B - again using Hose Clamps Up to 25 mm dia. 3094.

-

Release positive pressure in coolant expansion tank (remove hand pump).

-

Connect coolant hose - B - to coolant pipe - F -.

-

Install the removed components again in reverse order.

-

Evacuate refrigerant circuit and recharge again.

-

Bleed coolant circuit.

-

Check DTC memory of front A/C control head Climatronic Control Module J255 and of Rear A/C Control Head (Climatronic) E265 and erase
DTCs displayed if necessary. Vehicle Diagnosis, Testing and Information System VAS 5051 in "Guided Fault Finding" function.

-

Check function of A/C system if necessary. Vehicle Diagnosis, Testing and Information System VAS 5051 in "Guided Fault Finding" function.

Refrigerant Lines, Loosening and Assembling Connection Points|Page 4439 > < Refrigerant Lines, Loosening and Assembling Connection Points|Page 4437