audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Power Take-Off Drive Chain Assembly Overview|Page 2137 > < Power Take-Off Drive Chain Assembly Overview|Page 2135
Page 4
background image

-

Apply sealant beads - arrows - on clean sealing surfaces of the spur gear unit as shown in illustration.

‹› Thickness of sealant beads: 2.0 mm.

-

Install O-ring - 1 - and secure using some grease. 

‹› The spur gear unit must be installed within 5 minutes after application of sealant.

-

Position compress spring - 2 - for input shaft -  3 - in spur gear unit - 1 -.

-

Position spur gear unit and tighten bolts - 1 to 6 - in a diagonal sequence in stages.

Power Take-Off Drive Chain Assembly Overview|Page 2137 > < Power Take-Off Drive Chain Assembly Overview|Page 2135