Air Injection Control Valve: Testing and Inspection

Combination Valve, Checking

Recommended special tools and equipment

-

VAG1390 Hand Vacuum Pump

Test requirements

-

No leaks in vacuum lines or hose connections.

-

Vacuum hoses not clogged or kinked

-

Pressure hose for Secondary Air Injection (AIR) Pump Motor not clogged or kinked

Test sequence

-

Disconnect vacuum hose at combination valve.

-

Connect hand vacuum pump (VAG1390) to vacuum hose of combination valve.

NOTE:  Do not use pressurized air for the following test.

-

Disconnect pressure hose between Secondary Air Injection (AIR) Pump Motor and connecting pipe and blow into it with light pressure.
Combination valve must close.

-

Operate hand vacuum pump.
Combination valve must open.

If the combination valve does not open or it is constantly open:

-

Replace combination valve.