1 Series 125i (N52K) Convertible
Screwing sequence:
1.
Secure vane pump with screws
2.
Tighten side screws to 2 Nm
3.
Tighten front screws to 2 Nm
4.
Tighten down front screws to jointing torque and angle of
rotation
Tightening torque, 32 41 6AZ
.
5.
Release screws at side and check screw fastening points for
gap freedom
6.
Tighten down side screws to jointing torque and angle of
rotation
Tightening torque, 32 41 6AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Removing and installing or replacing power steering vane pump (N51, N52, N53)
BMW AG - TIS
17.01.2013 09:34
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -