1 Series 125i (N52K) Convertible
Pull drawbar member (1) in direction of arrow and pull out
overrunning equipment (2) in direction of arrow towards front.
Remove spacer tubes (1) and threaded pins (2) from guide bush
(3).
Press pins (1) inwards. Detach counter support (2) and guide
bush (3).
Maintenance:
Grease tow tube (4) and attach guide bush (3).
Installation:
Secure counter support (2) with new clamping sleeves to tow
tube (4).
Insert spacer tubes (1) and threaded pins (2) in guide bush (3).
Make sure spacer tubes (1) are correctly seated in guide bush (3).
RA Removing overrunning equipment/maintaining or replacing guide bush/installing ov
BMW AG - TIS
17.01.2013 19:14
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -