bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Additional Work For CNG Vehicle (remove And Install Low-pressure And Metering Un|Page 680 > < 9 RA Checking CNG System For Leaks And Correct Pressure (E36)|Page 678
Page 1
background image

13 80 700

Additional work for CNG vehicle (remove and
install low-pressure and metering unit
completely with retaining bracket)

Drain CNG system,

refer to section on draining the CNG system

Unfasten bolt (1) and remove ground wire on low-pressure unit.

Pull vacuum hose off low-pressure unit.

Disconnect plug connectors (1 to 3) on low-pressure unit.

Unfasten banjo bolts (1) of air intake lines on low-pressure unit.

Installation:

Replace sealing rings.

Tightening Torque,

refer to Technical Data 13 81 1AZ

RA  Additional work for CNG vehicle (remove and install low-pressure and metering un

BMW AG - TIS

17.01.2013  12:49

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

10 RA Additional Work For CNG Vehicle (remove And Install Low-pressure And Metering Un|Page 680 > < 9 RA Checking CNG System For Leaks And Correct Pressure (E36)|Page 678