3 Series E36 316i (M43) SAL
Double taper synchronization:
Connect needle bearing (5).
Install synchronizer ring (6), friction ring (4) and taper ring.
Position 1st gear wheel.
Caution!
Lug (3) must catch in opening (4) and lug (2) must catch in
opening (1).
Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.
Single taper synchronization:
Connect needle bearing (1).
Position synchronizer ring (2) with the lugs (3) to the sliding
blocks.
Note:
Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.
Connect 1st gear wheel (4).
Connect roller bearing (1), 5th gear synchronizer ring (2) and input
shaft to the output shaft (3).
Note:
Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.
Lift off input and output shafts from special tool 23 2 400
and lay to the side.
Layshaft:
3rd/4th gear synchronizing device:
For assembly, insert layshaft in special tool 23 2 400.
Lift out circlip (1).
Installation:
Replace circlip (1).
RA Detaching and mounting all synchronizing devices S5D 200G/250G
BMW AG - TIS
20.01.2013 05:02
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 8 -