3 Series E36 318tds (M41) TOUR
Remove taper ring (4).
Remove gear from 2nd gear (5) and needle bearing (6) from the
output shaft.
Press guide sleeve (1) on 1st/Reverse gears off output shaft and
remove using special tool 23 1 490 and hydraulic press.
Remove synchronizer ring (2), reverse gear (3) and needle
bearing (4) from the output shaft.
RA Dismantling and assembling all synchronizer units (S5D 200G/ E36 M41)
BMW AG - TIS
06.02.2013 22:45
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -