3 Series E36 320i (M52) CONVER
24 30 008
Removing and installing/replacing shift unit
(A5S 300J)
Note:
Remove oil sump, refer to 24 11 009.
Remove oil screen, refer to 24 31 158.
Remove plug connections (1...3) from brackets on shift unit and
detach.
Fold down retaining tabs and remove cable.
Disconnect plug connection (1).
Remove temperature sensor (2) from the bracket.
RA Removing and installing/replacing shift unit (A5S 300J)
BMW AG - TIS
07.02.2013 00:54
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -