bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G) > < 1 RA Replacing Output Flange For Transmission (S5D 200G _ 250G)
Page 2
background image

Brace output flange with special tool  23 0 020 .

Unfasten collar nut with special tool 23 1 210 .

Tightening torque: 23 21 1AZ

.

Installation:

Insert collar nut with Loctite 243 screw securing adhesive
(sourcing reference: BMW Parts Service).

Detach output flange with special tool 33 1 150  from output
shaft.

RA  Replacing output flange for transmission (S5D 200G / 250G)

BMW AG - TIS

19.01.2013  11:36

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

2 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G) > < 1 RA Replacing Output Flange For Transmission (S5D 200G _ 250G)