bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Overview Of Final Drive_output Shafts > < 8 RA Notes On Repairing Threads
Page 1
background image

33 00 ...

Rear axle: wheel/chassis alignment check must be carried out after the following work

 

A wheel/chassis alignment check must be carried out after the following work:

Release of following screw/bolt connections:

Rear axle carrier to body

Bearing block to trailing arm / body

Upper control arm to rear axle carrier / trailing arm

Lower control arm to rear axle carrier / trailing arm

 

Replacement of following parts:

1. 

Rear axle carrier / rubber mount

2. 

Lower control arm / rubber mount

3. 

Trailing arm / rubber mount / bearing block / ball joint

4. 

Upper control arm / rubber mount / ball joint

RA  Rear axle: wheel/chassis alignment check must be carried out after the following

BMW AG - TIS

19.01.2013  12:57

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

10 RA Overview Of Final Drive_output Shafts > < 8 RA Notes On Repairing Threads