bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

24 RA Treating Cables And Fibre-optic Cables > < 23 RA Socket Housing (radio Plug), Hybrid System MQS_MPQ|Page 2740
Page 3
background image

Press lock (1) in direction of arrow.

Pull secondary lock (2) in direction of arrow completely out of
contact carrier (3).

Press special tool 61 1 135 on inside of contact into contact carrier
(2).

Pull wire with socket contact (1) out of contact carrier (2). 

RA  Socket housing (radio plug), Hybrid System MQS/MPQ

BMW AG - TIS

19.01.2013  16:02

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

24 RA Treating Cables And Fibre-optic Cables > < 23 RA Socket Housing (radio Plug), Hybrid System MQS_MPQ|Page 2740