bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Removing And Installing_replacing Inlet And Exhaust Adjustment Unit (N42_N46)|Page 684 > < 1 RA Removing And Installing_replacing Inlet And Exhaust Adjustment Unit (N42_N46)|Page 682
Page 10
background image

Note:

For the timing check described below, the original chain tensioner
must be installed.

Install chain tensioning piston.

Remove special tools  11 9 291  and 11 9 292  from
camshafts.

Pull special tool  11 9 190  back until flywheel is no longer
secured in position.

Crank engine at central bolt twice in direction of rotation until
engine returns to firing TDC position of 1st cylinder.

Secure flywheel with special tool  11 9 190  in firing TDC
position of 1st cylinder.

Important!

Pay attention to special tool bore in automatic transmission.

Fit special tool  11 9 292  on inlet camshaft and check timing
adjustment.

Note:

The timing is correctly adjusted when special tool  11 9 292
rests flat on the cylinder head or protrudes by up to 0.5 mm to
the exhaust side.

RA  Removing and installing/replacing inlet and exhaust adjustment unit (N42/N46)

BMW AG - TIS

20.01.2013  19:00

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 10 -

1 RA Removing And Installing_replacing Inlet And Exhaust Adjustment Unit (N42_N46)|Page 684 > < 1 RA Removing And Installing_replacing Inlet And Exhaust Adjustment Unit (N42_N46)|Page 682