3 Series E46 320d (M47TU) SAL
13 53 180
Replacing pressure line (between high-
pressure pump and pressure accumulator)
(M57 / M47TU / M57TU / M47T2)
Special tools required:
•
13 5 020
Layout of common rail system.
Necessary preliminary tasks:
•
Read fault memory of DDE control unit.
•
Switch off ignition.
•
Cover intake ducts.
•
Disconnect and connect intake air manifold.
Important!
When working on the oil, coolant or fuel circuit, you must
protect the alternator against contamination.
Cover alternator with suitable materials.
Failure to comply with this procedure may result in an
alternator malfunction.
RA Replacing pressure line (between high-pressure pump and pressure accumulator) (M
BMW AG - TIS
12.02.2013 14:14
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -